|
|
|
PARTS CATALOGUE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construction Heater - Rentals |
|
|
|
|
|
Data Sheet (in PDF
format) |
|
|
|
|
|
|
|
|
|
|
|
LEGALETT
Part # |
Part Description |
|
Add to Cart |
|
|
7029 |
Construction Heater Rental |
|
|
* 4 foot
long 220V Twist Lock Plug cord is Included.
* 2 foot long 220V Male Dryer Plug adaptor is included upon request
* The Shipping Crate is Included.
|
|
|
|
|
* 220V Dryer Receptacle and 3 AWG 10 (minimum) Extension Cord are Not
Included. |
|
|
|
|
Construction Heater notes: |
|
|
The use of
a construction heater for a minimum of two weeks after the structure is
closed in, and before the permanent inserts are installed, is required to
validate the warranty.
Legalett can rent to the customer a temporary heater during construction
The heater will be shipped with the material, or at a later date, as per
the customer’s request.
The customer will be responsible for shipping costs of heaters shipped at a
later date. |
|
|
|
|
Deposit
per unit: $1,500, refundable less rental amount.
Rent per week: Minimum charge $200
for the first 4 weeks, and $100/week thereafter from the time the heater is
shipped to site until it is sent by the customer to Legalett. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|